FAQ Header

What quality control steps are performed during 40% grade production?

Quality control is embedded throughout production. The 40% grade has additional QC checkpoints at the purification stages to verify mogroside concentration before spray drying.

QC Process Overview (40% Grade)

StageQC CheckPass Criterion
Raw material receiptMoisture, appearance, Mogroside contentMoisture ≤12%, Mogroside V ≥0.8%
Post-extractionHPLC monitoringMogroside V within target ±2%
Multi-pass resin enrichmentHPLC of enriched fractionMogroside V ≥40% before drying
Pre-spray dryingFinal HPLC, microbial pre-checkMogroside V ≥40%, TPC ≤10,000 cfu/g
Post-spray dryingParticle size, moisture, bulk densityPer spec sheet
Pre-shipmentFull COA panelAll within limits
PackagingWeight, seal, labelingNet weight ±2%
All QC data recorded in batch records retained 5 years. The purification-stage HPLC check guarantees the ≥40% specification consistently. Discuss specific QC protocols (SQF, BRC, FSSC 22000) before order.

Relate Products

This article was published on 2026-09-02, and last updated on 2026-09-02. The article will be continuously updated.