What quality control steps are performed during the production process?
Quality control is embedded throughout the production process — not just at the final inspection stage. Our QC system covers raw material incoming inspection, in-process monitoring, and final release testing.
QC Process Overview
| Stage | QC Check | Pass Criterion |
|---|---|---|
| Raw material receipt | Moisture, appearance, Mogroside content | Moisture ≤12%, Mogroside V ≥0.8% |
| Post-extraction | HPLC monitoring at each concentration stage | Mogroside V within target ±2% |
| Pre-spray drying | Final HPLC test, microbial pre-check | Mogroside V ≥20%, TPC ≤10,000 cfu/g |
| Post-spray drying | Particle size, moisture, bulk density | Per product spec sheet |
| Pre-shipment | Full COA panel (heavy metals, pesticide, micro) | All within limits |
| Packaging | Weight check, seal integrity, labeling accuracy | Net weight ±2%, label correct |
If your market has a specific QC protocol requirement (SQF, BRC, FSSC 22000 specific audit requirements), discuss with our quality team before order — we may already meet the standard or can implement additional controls.
This article was published on 2026-09-02, and last updated on 2026-09-02. The article will be continuously updated.